Verified SSM &As - Provide SSM with Correct Answers [Q52-Q77]

Share

Verified SSM Exam Dumps Q&As - Provide SSM with Correct Answers

Pass Your SSM Dumps Free Latest Scrum Practice Tests


Scrum SSM (SAFe 5 Scrum Master) Certification Exam is a rigorous exam that tests the knowledge of individuals in the popular Agile methodology, SAFe (Scaled Agile Framework). The SAFe framework is used by many organizations worldwide to manage large-scale software development projects. The Scrum SSM certification is an important step for those who wish to become proficient in SAFe and take on the role of a Scrum Master in a SAFe environment.

 

NEW QUESTION # 52
What is Cost of Delay?

  • A. Opportunity cost and deferred revenue.
  • B. Cost incurred when system integration appears too late in the PI.
  • C. Cost of not addressing risk early on.
  • D. Penalty for nonperformance.

Answer: A


NEW QUESTION # 53
During PI planning who owns the planning of stories into iterations?

  • A. scrum master
  • B. product management
  • C. Agile teams
  • D. system architect

Answer: C


NEW QUESTION # 54
Test automation is typically included in the Definition of Done (DoD).

  • A. False
  • B. True

Answer: A


NEW QUESTION # 55
Building Enterprise-Class Software and cyber-physical systems are one of the most complex challenges our industry faces today.

  • A. False
  • B. True

Answer: B


NEW QUESTION # 56
Is the ART Sync a cadenced event?

  • A. No
  • B. Yes

Answer: A


NEW QUESTION # 57
Which two options are considered Agile practices? (Choose two.)

  • A. Timeboxing
  • B. Test-Driven Development
  • C. Batching work for testing efficiency
  • D. Building GANTT charts
  • E. Making sure requirements are complete prior to development

Answer: A,B


NEW QUESTION # 58
How are the 3 Whys used?

  • A. to coach a team through powerful questions
  • B. to brainstorm ideas
  • C. to define acceptance criteria for a story
  • D. to identify a root cause of a problem

Answer: D


NEW QUESTION # 59
What does the SAFe budgeting model suggest?

  • A. Each Strategic Theme receives a budget allocation when Strategic Themes span portfolios.
  • B. Each Value Stream receives budget allocation as a whole; individual work is not specifically budgeted.
  • C. Epics, Features, and Stories are funded based on their size in normalized Story points, while teams are allocated to high-priority work as needed.
  • D. Each team gets budget allocation and Features are funded according to their size in normalized Story points.

Answer: B


NEW QUESTION # 60
Participating in PI planning enables teams to gain alignment and commitment around a clear set of what?

  • A. features and benefits
  • B. prioritized objectives
  • C. user stories
  • D. team dependencies

Answer: B


NEW QUESTION # 61
How does work flow from one state to the next in a Team Kanban board?

  • A. During the Daily Stand-up, team members make decisions and discuss how to move the work
  • B. People working in the first state move the work to the next work state
  • C. The Scrum Master moves the work from one state to the next to ensure ongoing progress within the team
  • D. Team members of a state pull work from the previous state when they can do so without impacting their current state WIP constraint

Answer: D


NEW QUESTION # 62
How can learning milestones be used?

  • A. To meet contractually binding dates for delivery of value
  • B. To meet release dates set by external business partners
  • C. To test the concept of a new feature or capability
  • D. To mark events such as trade shows and product announcements

Answer: C


NEW QUESTION # 63
What is the purpose of the plan-do-check-adjust cycle?

  • A. To provide regular, predictable dev cadence to produce an increment of value
  • B. To allow the team to perform some final backlog refinement for upcoming iteration planning
  • C. To create a continuous flow of work to support the delivery pipeline
  • D. To give the ART members a process tool to keep the train on the tracks

Answer: A


NEW QUESTION # 64
Who can change the backlog during an iteration?

  • A. Scrum master
  • B. Release Train Engineer
  • C. Senior Management
  • D. Agile Team

Answer: D


NEW QUESTION # 65
Every Enabler Capability has an Enabler Epic as its parent.

  • A. False
  • B. True

Answer: A


NEW QUESTION # 66
What does the Improvement Roadmap document?

  • A. The organization's business strategy
  • B. Code which needs refactored
  • C. New practices the team wants to adopt
  • D. Relevant training the team has completed

Answer: C


NEW QUESTION # 67
Why is it important to organize the work for Iteration Planning?

  • A. So a realistic work scope can be defined
  • B. So the backlog can be prepared
  • C. So the Scrum Master can prepare workload for the Continuous Delivery Pipeline
  • D. So the team can load balance

Answer: A


NEW QUESTION # 68
Who participates in the Inspect and Adapt event?

  • A. Everyone involved in building the system
  • B. Product Managers and Product Owners
  • C. Only stakeholders and Agile team members
  • D. Agile teams, Release Train Engineers, System and Solution Architect/Engineering

Answer: C


NEW QUESTION # 69
During Iteration Review, the team decides to carry forward three stories to the next Iteration. This is the second time during this PI that some of the team's stories are carried over.
What are two actions the Scrum Master should take? (Choose two.)

  • A. Take a 'wait and see' approach because the team assures they are still on track for the PI
  • B. See if the Product Owner is agreeable to moving the stories into the next Iteration
  • C. Perform the 5 Whys to find the root cause of all delays
  • D. Discuss the issue at the next Iteration Retrospective
  • E. Coach the team to honor their commitments

Answer: C,E


NEW QUESTION # 70
What are the right scenarios for using SAFe Foundations Training Materials? (Select 2)

  • A. Train Scrum Masters in servant leadership following "SAFe for Teams" training.
  • B. Familiarize Release Train Engineers with the PI Planning process.
  • C. Familiarize executives with SAFe.
  • D. Train the teams prior to PI Planning.
  • E. Make an initial presentation on SAFe to the organization.

Answer: C,E


NEW QUESTION # 71
Who participates in the backlog refinement event?

  • A. All train stakeholders
  • B. All the people on the train
  • C. The Agile Team members and other Subject Matter Experts
  • D. The development team

Answer: C


NEW QUESTION # 72
Where does a team document new practices they want to incorporate into the their collective skill set?

  • A. PI Planning meeting post-meeting notes
  • B. Team Iteration Backlog
  • C. Inspect and Adapt workshop notes
  • D. Improvement Roadmap

Answer: C


NEW QUESTION # 73
What is the value of periodic resynchronization?

  • A. It causes multiple events to happen serially
  • B. Products that are delivered earlier provide more value
  • C. WIP is maximized
  • D. It limits variance to a single time interval

Answer: D


NEW QUESTION # 74
What are two typical anti-patterns with Product Owners (POs)? (Choose two.)

  • A. POs design the solution before bringing the intent to the team
  • B. POs ask the team for help in writing user stories
  • C. POs bring the business problem to the team and ask the team to design the solution
  • D. POs and Product Managers are not aligned with business intent
  • E. POs facilitate story grooming sessions with the team during the Iteration

Answer: A,B


NEW QUESTION # 75
During PI Planning, the Scrum of Scrums meetings helps accomplish which two actions? (Choose two.)

  • A. Rolling up the PI Business Value objectives
  • B. Looking for ways to increase team velocity
  • C. Comparing velocities across the teams
  • D. Exposing risks, impediments, and dependencies
  • E. Keeping the planning milestones on track

Answer: D,E


NEW QUESTION # 76
Which statement is true about scrum?

  • A. it is based on empirical process control theory
  • B. it is a Lean system Engineering technique
  • C. It is an ideal method for static design requirements
  • D. It is a software technical practice

Answer: B


NEW QUESTION # 77
......


Scrum SSM Certification Exam is a valuable certification for professionals who wish to enhance their skills and knowledge in Agile and Scrum methodologies. SAFe 5 Scrum Master (SSM) certification is recognized globally and is highly valued by organizations that use Agile practices. SAFe 5 Scrum Master (SSM) certification exam is a rigorous process that requires individuals to demonstrate their understanding of Scrum and Agile practices, and it helps them to advance in their careers.

 

Get Top-Rated Scrum SSM Exam Dumps Now: https://www.examboosts.com/Scrum/SSM-practice-exam-dumps.html

SSM Exam Dumps Pass with Updated Tests Dumps: https://drive.google.com/open?id=1_eCCbazfPOU72x-luy8M2z5qvfEMpLAn